Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the astra-sites domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u958332238/domains/3mh-contracting.com/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the hostinger domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u958332238/domains/3mh-contracting.com/public_html/wp-includes/functions.php on line 6121

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the astra domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/u958332238/domains/3mh-contracting.com/public_html/wp-includes/functions.php on line 6121
Projects – 3mh-contracting.com

Projects

Projects

All the Projects below were done in Saudi Arabia under Management of Chairman of 3MH-Contracting Mr.Hany Soliman Mahmoud

Almoosa specialist Hospital. GOLD LEED PROJECT

  • Project Value: 160,000,000 SAR (MEP SCOPE)
  • Description of project: 12Hospital Floors, 2 administration & Auditorium Floors, 5 Basements, 3 Service Floors, HVAC is Chilled Water System 4 Chillers (Each 1550 TR), 4 Cooling Towers.

DR. Suliman Al Habib Hospital Al Khobar

  • Client & Location: DR. Suliman Al Habib Medical Group -HMG – Al Khobar – KSA
  • Team Size: (1500 Subordinates)
  • Project Value: 360,000,000 SAR (MEP SCOPE) with total area of 250,000 sq. meter
  • Description of project: 6 Hospital Floors, 9 Residential Floors , 2 Basements , 3 Service Floors, HVAC is Chilled Water System 5 Chillers (Each 1550 TR) , 5 Cooling Towers, .
  • Role: MEP Project Manager.
  • Responsibilities: Project Director MEP execution

Dar Al-Hijra

4A, 5 Tower mega project

In PKG4A, there are three buildings types; T2B1, T2B2 and T2A1 – Hotel Buildings.

We Provide the Best Service in Industry​